Proof Hub | Real Projects | Working Facilities
Beverage Manufacturing Case Studies
These beverage manufacturing case studies show how Solon moves from planning into working facilities. The point is not to hide trust in an archive. The point is to show buyers the kind of execution, coordination, and operating context that can be reused across brewery, winery, distillery, RTD, and broader manufacturing work.
Use Proof The Right Way
These case studies should help buyers find the right kind of project evidence fast
Brewery Startup And Expansion
Turnkey build-outs, cellar and brewhouse coordination, startup planning, and brewery commissioning support.
Winery And Distillery Upgrades
Thermal systems, cellar cooling, specialty process equipment, and site-specific mechanical redesigns.
Automation And Commissioning
Controls visibility, startup sequencing, contractor coordination, and process stabilization after equipment lands.
International And Specialized Work
Projects that require remote coordination, multilingual communication, staff training, or transition from artisanal to commercial scale.
Proof Index
Find the right case study before you decide which page should own the next step
| Project | Market | What Solon handled | Route next |
|---|---|---|---|
| Old Gregg Brewing Company | Brewery startup, Pflugerville, Texas | Complete turnkey brewery design and manufacture with automation, thermal systems, and project oversight | Brewery Consulting |
| Pouring With Heart Hospitality Group | Dual-site brewpub development, Texas | Multi-site standardization, parallel project coordination, and scalable infrastructure planning | Brewery Consulting |
| Augusta Vin Winery | Winery cellar cooling control, Fredericksburg, Texas | Cooling-system replacement, layout redesign, future expansion planning, and on-site management | Winery Consulting |
| FMN Brewery | International brewery project, Greece | International project management, commissioning, staff training, configuration support, and process refinement | Brewery Consulting |
| Tibi Soda | Commercial beverage plant, Mexico | Facility layout, SOP emphasis, and quality-control structure for moving from artisanal to commercial scale | Food And Beverage Consulting |

Featured Brewery Proof
Old Gregg Brewing Company shows what full-scope brewery execution really looks like
This project remains one of the clearest proof assets in the Solon system because the work did not stop at advice. The scope reached into turnkey brewery design and manufacture, centralized control through a custom HMI, modular heating and glycol planning, and continuous project guidance across teams that had to build a facility that could actually produce.
- Custom HMI architecture built for centralized process visibility and operator convenience.
- Thermal and glycol system planning designed for reliability and future steam integration.
- Project oversight spanning teams, inspectors, contractors, and facility stakeholders.

Augusta Vin Winery
A winery cellar cooling-control project that required removing a failing system, redesigning the pipe layout, and improving the facility for future expansion. It is a clean example of Solon doing technical retrofit work that goes beyond brewery startup language.
- Optimized the pipe layout to reduce fittings and improve positioning.
- Added design changes for future expansion and new chiller tie-in flexibility.
- Managed on-site installation with attention to labor cost and schedule control.

FMN Brewery, Greece
International project management for a 1,000+ hectoliter brewery with commissioning, contractor management, training, equipment-configuration guidance, and ongoing process refinement. This is the kind of proof that matters when a buyer needs technical depth plus remote execution discipline.
- Managed local cooler, cold, and electrical infrastructure alongside equipment assembly.
- Supported commissioning, training, and system configuration with existing equipment.
- Extended into recipe development, staff training, and continuous process refinement.
More Proof Context
A proof hub should feed the rest of the site, not trap trust inside itself
Use Proof To Clarify Fit
Case studies should help buyers understand what kind of plant, project stage, and technical complexity Solon can actually carry.
Use Proof To Route Buyers
The right next click after proof is usually a vertical or capability owner page, not another archive that keeps the buyer circling.
Use Proof To Reduce Risk
Named clients, project scopes, and operating context reduce more buyer anxiety than another page of abstract consulting claims.



Turn proof into the right next move
If these case studies match the kind of plant, retrofit, startup, or operational recovery you are planning, move straight into the page that best fits the problem. If you still need help sorting the route, use the contact path and Solon will point you to the right lane.